研究成果
期刊论文|Deployment and demonstration of wide area monitoring system in power system of Great Britain
发布时间:2022年05月12日 21:37    作者:    点击:[]

Deployment and demonstration of wide area monitoring system in power system of Great Britain


作者:Peter WALL; Papiya DATTARAY; Zhaoyang JIN; Priyanka MOHAPATRA; James YU; Douglas WILSON; Karine HAY; Stuart CLARK; Mark OSBORNE; Phillip M. ASHTON; Vladimir TERZIJA

摘要:The creation of a suitable wide area monitoring system (WAMS) is widely recognized as an essential aspect of delivering a power system that will be secure, efficient and sustainable for the foreseeable future. In Great Britain (GB), the deployment of the first WAMS to monitor the entire power system in real time was the responsibility of the visualization of real time system dynamics using enhanced monitoring (VISOR) project. The core scope of the VISOR project is to deploy this WAMS and demonstrate how WAMS applications can in the near term provide system operators and planners with clear, actionable information. This paper presents the wider scope of the VISOR project and the GB wide WAMS that has been deployed. Furthermore, the paper describes some of the WAMS applications that have been deployed and provides examples of the measurement device performance issues that have been encountered during the project.

发表于:Journal of Modern Power Systems and Clean Energy (Volume 4, Issue 3. 2016)


上一条:期刊论文|A Screening Rule-Based Iterative Numerical Method for Observability Analysis 下一条:期刊论文|A Distributed Calculation Method for Robust Day-Ahead Scheduling of Integrated Electricity-Gas Systems

关闭

Copyright © 2021 All rights reserved. 版权所有:beat365(中国)·正版唯一网址-下载App Store科研团队 电话:0531-88392369 传真:0531-88392369 BEAT365唯一官网千佛山校区 济南市经十路17923号 邮编 250061 BEAT365唯一官网兴隆山校区 济南市二环东路12550号 邮编 250002